Relative to scope, in the last 3 years

Nambiti KZN :
In collaboration with lead interior architect 
Key roles: Furniture/Decor and Guest experience selections
Imfolozi KZN : 
Key roles: Interior Furniture/Fitment/Decor and Guest experience selections

software

Design: Revit | AutoCAD

Model + Render: Lumion | D5 Render | 3DS Max | Sketch Up

Present: Adobe Creative Suite | Photoshop | Canva | Wix | Square Space

Document: Microsoft Office Suite | Acrobat Reader

 

Model Furniture in 3D and produce 3D views:

Yes, a combination of the above software would be used to formulate and produce

3D models, views and renders.

studio 

Offices in both Botswana and Cape Town, with our design division being based

in Val De Vie Estate, Paarl, with regular travel into Cape Town.

Co-Ordination
A collaborative team dynamic that strengthens the overall creative design by sharing ideas, helping where needed, and fostering a relationship built on pride,
team work and attention to detail.

Vision:

Begin with a collaborative deep dive into the lodge overview, spatial mood, and guest journey.

Scope:

Define clear boundaries and intersections: where architecture support interior storytelling, and where interiors elevate architectural form.

Timeline:

Create a unified schedule with design freeze dates, material lead times, and decision points.

Revisions:

Establish a respectful and efficient process for revisions when concepts evolve.

Communication:

Short, consistent check-ins to flag decisions, potential bottlenecks, or scope.

Untitled design (2).png
Procurement

Refer to Savings page for a detailed insight into our procurement division.

Our In house procurement team works hand in hand with the client and our design division to ensure

the best products are sourced at the best prices within the best timeframes.

Procurement Brief:
Document project scope, budget guidelines, timelines, and supplier expectations.


Quote Comparatives:
Request for Quotes with exact specs and timelines.
Compare by cost, craftsmanship, lead time, and warranty.


Ordering & Logistics:
Cross-check deliveries with construction schedules and consolidate shipments to reduce customs complexity.

 

installation 
Time frame: 

Installation of finishes, lighting, furniture fixtures, and custom elements to run concurrently with structural installation schedule.

Final On-site styling styling, art placement, and guest experience detailing,

Snagging & Handover (1 month)

Coordinate:

Coordinate installations based on delivery and construction timeframes.

Prepare room by room install guides, complete with visuals, placement notes,

and handling instructions.

Site Inspection: 

Ensure site is ready for fitments / installations in advance,

with ample time being given to trades for remedial work prior to installation.

Detailed site clean is required prior to our teams arriving to install.

Install:

Our coordinated team of installers/designers take a hands on approach in the installation. Ensuring meticulous attention to detail and placement.

Snag: 
Post-install walk-through to perform deficiency checks, supplier close-outs, and operational handover.

overlaps 

Mechanical, wet works and electrical specialists to be involved from the conceptual stage of design,

to ensure all aspects pertaining to each trade are included in the overall design.

Thereafter the interior scope will fall onto the interior design team to produce technical drawings

and selections in keeping with the architectural vision and overview of the lodge.

*Conceptual selections and drawings to be discussed with the architect prior to advancing with details.*